Blaydon

Battery Storage
Aura Power have gained planning permission for a100MW battery storage site at Newburn Bridge Road, Blaydon. The site is located on brownfield land, on an industrial estate close to one of Northern Powergrid's electricity substation.

Battery storage systems, such as this, play a crucial role in the decarbonisation of our electricity network with much needed increases in renewable energy sources. Batteries store excess energy at times of low demand i.e. from a solar farm on a sunny day, and discharge the energy back into the grid when it is needed the most.
No items found.

Latest News

January 2022 - Planning permission was granted and the project rights were then acquired by TRIG to undertake the construction and operation.

DC/21/00922/FUL | Development of a Battery Storage Facility, associated infrastructure and grid connection

View

Download
Aug 2021

Planning application was submitted to Gateshead Council.

Jan 2022

Planning permission granted

Jul 2023

Construction is anticipated to commence.

Key Facts & Benefits

26595

Equivalent number of homes powered

66000

Carbon dioxide (tonnes) saved, per year, from entering the atmosphere compared to a traditional gas peaker plant

2000

Equivalent number of typical electric vehicles (50kwh batteries)

Contributes to local and national targets
Local School Visits

Our Proposal

The battery storage development would import and export power from the grid and store that power within the batteries. As such, it would not result in any emissions during operation. It would act as a ‘balancing service’ for the grid in balancing frequency at times of system stress. In simple terms, battery storage provides a means of allowing electricity from the grid to be imported and stored within the batteries at times of low usage, and exported back into the grid at times of system stress / demand.
The site is located approximately 300m from Northern Powergrid's existing electricity substation meaning energy stored in the batteries can be released rapidly back into the grid.
The proposal also includes some off-site biodiversity enhancements that will be delivered by Gateshead Council.

Projected Views

Contact Us

Your feedback is very important to us. Please leave a comment and one of our project team will get back to you as soon as possible.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.